office@enimex-bg.com
042 604 832
Toggle navigation
Home
ABOUT THE COMPANY
ACTIVITIES
Repair and reconstruction of up to 400 kV power transformers
Regeneration and outgassing of transformer's oil. Turbine oil regeneration
Repair of turbo-generators and electrical motors
Electrical installation activities
Electro-Laboratory
Service activities
Specialized equipment
Deliveries
PROJECTS
Contacts
PROJECTS
PROJECTS
More significant completed projects
Planned repairs on the territory of Kozloduy NPP
Read more
Retrofit of 10 kV and 20 kV circuit breakers at Zaharni Zavodi TPP, Gorna Oryahovitsa
Read more
Regeneration of Used Turbine Oil TP 32
Read more
Emergency Repair and Replacement of 400kV terminals at Unit increasing Transformer at AES-3C Maritsa East 1 EOOD
Read more
Installation of 400 kV terminals of transformers 7T and 8T
Read more
Dismantling and assembly of the retaining rings and hubs of the axial fans of the rotor of Generator № 8 at TPP Maritza East 2 EAD
Read more
Repair of Generator Unit 2 in ContourGlobal Maritza East 3 AD
Read more
Replacement of the lighting of a 325m long chimney "Contour Global Maritza East 3" AD
Read more
Partial repair of stator coil of Siemens-Schuckert generator, produced in 1914 and electrical tests of its insulation at the Enina HPP
Read more
Emergency repair of TG1 in LUKOIL Neftohim Bourgas AD
Read more
Overhaul and drying of the active part of a 110/20/6 kV power transformer in Rosenets" TS
Read more
Drying of the active part and regeneration of the oil of power transformer 2T in the ГПП1 of KCM - Plovdiv - KCM AD Plovdiv
Read more
Major overhaul of transformer type: UTMRU 6300/35 f. № 17842 - KCM AD Plovdiv
Read more
Replacement of five electric motors per pos. 321 - Workshop 608. "NEOCHIM" JSC - Dimitrovgrad.
Read more
Supply, dismantling and installation of earthing equipment through active resistance of a 6.3 kV network, galvanically connected to a transformer N 2, 6.3MVA at "Gorna Oryahovitsa" TPP
Read more
Supply, disassembly and installation of power disconnectors of 110 kV in "Maritza East" EAD
Read more
Installation of a cut-off valve of power transformers 400/20 kV in "AES-3C Maritsa East 1" EOOD
Read more
Supply, dismantling and installation of 110 kV power circuit breakers in "Maritza East Mines" EAD"
Read more
«
1
2
»
Home
ABOUT THE COMPANY
PROJECTS
Activities
PARTNERS
Contacts
BG
EN
RU