Service Overview
On the Unit transformers №1 and №2 in the AES-3C Maritsa East 1 EOOD were installed 2 cut-off valves. A part of the transformer oil with a degassing machine was discharged for the task. The pipeline was reconditioned to ensure that the shut-off valve was installed and the necessary functional samples were made.