Project Description
- Client: KCM AD
- Location: Plovdiv
- Category: Repair
Service Overview
During the repair, revision and tightening of the active part of the transformer, replacement of the HV and LV terminals, replacement of the disk closures to the coolers, adaptation and installation of the blast valve was carried out. Reconstruction of the expansion vessel and installation of a level meter. Replacement of control and measuring equipment of the transformer with construction of the adjacent secondary commutation. Thermal vacuum drying of the winding. Regeneration of the transformer oil until it reaches new indicators. Complete electrical measurements before and after repair in 2016.