Project Description
- Client: EVN Bulgaria Toplofikatsia EAD
- Category: Repair
Service Overview
The project, which we implemented on the territory of TPP North in Plovdiv, EVN Bulgaria, included some major activities: Overhaul of transformer 10MVA 20 /6,3 kV, including opening the transformer, clamping of the active part, revision of the power switch and regulator Yansenov, leak removal, and painting. Electrical measurements and functional samples were also performed.