Projects.More significant completed projectsAll Projects Installation Repair Repair Planned repairs on the territory of Kozloduy NPP + Installation Retrofit of 10 kV and 20 kV circuit breakers at Zaharni Zavodi TPP, Gorna Oryahovitsa + Repair Regeneration of Used Turbine Oil TP 32 + Repair Emergency Repair and Replacement of 400kV terminals at Unit increasing Transformer at AES-3C Maritsa East 1 EOOD + Installation Installation of 400 kV terminals of transformers 7T and 8T + Installation Dismantling and assembly at TPP Maritza East 2 EAD + Repair Repair of Generator Unit 2 in Contour Global Maritza East 3 AD + Installation Replacement of the lighting of a 325m high chimney “Contour Global Maritza East 3” AD + Repair Partial repair of stator coil Enina HPP + Repair Emergency repair of TG1 in LUKOIL Neftohim Bourgas AD + Repair Overhaul and drying of the active part of a 110/20/6 kV power transformer in Rosenets TS + Repair Drying of the active part and regeneration of the oil of power transformer 2T in the ГПП1 of KCM – Plovdiv – KCM AD Plovdiv + Repair Major overhaul of transformer type: UTMRU 6300/35 f. № 17842 – KCM AD Plovdiv + Installation Replacement of five electric motors per pos. 321 – Workshop 608. “NEOCHIM” JSC – Dimitrovgrad. + Installation Supply, dismantling and installation at “Gorna Oryahovitsa” TPP + Installation Supply, disassembly and installation of power disconnectors of 110 kV in “Maritza East” EAD + Installation Installation of a cut-off valve of power transformers 400/20 kV in “AES-3C Maritsa East 1” EOOD + Repair Revision, measurement, repair, painting and testing of the power transformer ТО – 10 MVA, 20 / 6,3 kV in EVN Bulgaria Toplofikatsia EAD in TPP North. + Installation Electrical installation activities in Ignalina NPP, Lithuania + Repair Overhaul and drying of the active part of a 110/6 kV power transformer at “Rosenets” TS + Installation Supply, disassembly and installation of power disconnectors of 110 kV in “Maritza East” EAD +